Trade guide

Flooring quote template: what a professional UK quote includes

For UK flooring retailers and fitters · 8 minute read · Updated July 2026

Two quotes land in a customer's inbox. One is a text message: "carpet supplied and fitted £1,850". The other is an itemised PDF: the product named with its width and colour, each room listed, underlay specified, uplift and disposal as a line, fitting as a line, deposit terms, and a validity date. Even when the totals are identical, the second quote wins more often — because a quote isn't just a price, it's the customer's first evidence of how you work.

This guide is the template: every section a professional flooring quote should carry, the order to put them in, and the handful of sentences in the terms that prevent the most common disputes.

The header: who, where, when

The body: itemised, area by area

List each area with the product specified, then the supporting lines. Specificity is your friend twice over: the customer sees exactly what they're buying, and six weeks later there's no argument about which grade of underlay was included.

SectionWhat the line saysWhy it matters
MaterialsProduct name, colour, roll width, per area — plus underlay grade, gripper, adhesivesPrevents "I thought it was the thicker one" and pins the spec you priced. The quantity comes from your cutting plan (see our wastage guide)
FittingFitting per area; stairs called out separatelyStairs cost more — showing it avoids subsidising them invisibly
PreparationUplift & disposal, furniture moving, subfloor prep (latex, ply)The most commonly forgotten money on flooring quotes
SundriesDoor bars, trims, easing doorsSmall lines that leak margin when unwritten
TotalsSubtotal, VAT stated explicitly, fixed totalA surprise 20% at invoice is how good jobs become bad reviews
Deposit & paymentDeposit amount to accept, balance due on completion, how to payCut carpet can't be restocked — the deposit should cover materials

One total, many lines. Itemise the build-up but present a single fixed price for the job — not a rate card. The itemisation explains; the fixed total commits. How to build those numbers honestly is covered in our guide to pricing carpet fitting.

The terms that prevent disputes

You don't need three pages of legalese. You need the six sentences that cover the ways flooring jobs actually go wrong:

Deposit: how much and when

Common UK domestic practice is a third to a half on acceptance, before materials are ordered, with the balance on completion. The logic to apply to your own number: once a 4m roll is cut for a specific house, it has no other buyer — so the deposit should at least cover the material cost. State how to pay (card link, bank transfer) on the quote; the easier the deposit is to pay, the faster jobs confirm.

Presentation: the quiet salesman

A clean PDF with your branding, sent the same day as the measure, beats a better price sent on Thursday. Speed is the part people underestimate: the first professional quote frames what "normal" looks like, and every later quote is compared to it. If your process needs an evening at the kitchen table to produce the PDF, that's the process costing you jobs, not the price.

Two upgrades worth making if your tooling supports them: online acceptance (a link where the customer accepts and pays the deposit in one step, instead of "reply to confirm and we'll send bank details"), and expiry automation — a polite nudge before the 30 days run out, which is often the cheapest job you'll ever win.

The template, already built

PlanIt produces the itemised PDF quote from your measurements and rates — cutting plan behind the material line, stairs priced separately, deposit and online acceptance built in. From £19 per user a month, with unlimited quotes.

Start a free trial

Frequently asked questions

What should a flooring quote include?

Business and customer details, quote reference and validity, each area with product specified, itemised materials, fitting, preparation and sundries, the VAT-inclusive total, deposit and payment terms, and short terms covering subfloor, access, lead time and cancellation.

Itemised or one figure?

Itemised lines under one fixed total. It reads as thoroughness, explains the price, and pre-agrees what happens if the customer removes a line.

What deposit should I take?

Commonly a third to a half on acceptance, before ordering — at minimum enough to cover materials, since cut rolls can't be restocked.

How long should the quote stay valid?

State it — 30 days is typical. It protects you from supplier price rises and stops quotes coming back from the dead a season later.